Windows, Stairs and Floors
There has been a lot of progress with the loft. The stairs are in and just yesterday the loft windows and some plasterboard went on. There is still some black plastic on the roof so something is not completed up there.
The upstairs windows at the front are missing. The new windows are on order. We had to make decisions on which windows would open and which would not. I've been trying very very hard not to say... They should all open damnit. There has been a few things like this that have to remind me that I don't live in Australia anymore. There are no flyscreens and not all the windows need to open.
Work has started on the plumbing. They replaced the mains pipe from the road, which required a hole dug in the front garden and the entrance way floor. The kitchen has been stripped and the floor dug up. Currently the house is without running water (good thing we are not living there)
The upstairs windows at the front are missing. The new windows are on order. We had to make decisions on which windows would open and which would not. I've been trying very very hard not to say... They should all open damnit. There has been a few things like this that have to remind me that I don't live in Australia anymore. There are no flyscreens and not all the windows need to open.
Work has started on the plumbing. They replaced the mains pipe from the road, which required a hole dug in the front garden and the entrance way floor. The kitchen has been stripped and the floor dug up. Currently the house is without running water (good thing we are not living there)
Comments
Post a Comment